The working time for a room depends on the surfaces included and preparation required. A straightforward wall skim is different from a room with ceiling work, repairs or failed backgrounds. Drying and decorating happen after the plastering work itself and need separate time.
Define what 'plaster a room' means
One wall, four walls, walls plus ceiling and a room needing extensive preparation are different jobs. Ask for the expected working sequence based on the quoted scope rather than relying on a generic room time.
Preparation can take longer than the visible finish
Protecting access, repairing backgrounds, boarding or dealing with awkward details can all happen before the final skim. That time is part of creating the surface you see at the end.
Work duration and drying duration are not the same
A plasterer can finish the physical application while the room is still not ready to paint. Keep the plastering booking, drying period and decorating date as separate stages in your plan.
Build in room for discoveries
Renovation work can expose damaged areas once loose material is removed. A good programme allows the scope to be confirmed without forcing the next trade into the room before the surface is ready.
Ask how long the quoted scope should take, then plan drying and decorating separately. 'One room' is not a standard unit of time.