Treat plastering, drying and decorating as separate stages. Once the plaster is suitably dry, the decorator can prepare and paint it using a system appropriate for new plaster.
Stage 1: plastering complete
At handover, ask what work was carried out and whether any areas were deeper repairs or different materials. Keep those details for the decorator.
Stage 2: allow the surface to dry
Do not book paint solely by counting from the final plastering day. Thickness, temperature and background influence drying, so the actual surface needs to be ready.
Stage 3: inspect before covering
If you see persistent damp-looking areas, movement or another problem, ask before painting. Paint should not become the method for hiding uncertainty about the background.
Stage 4: use the correct paint preparation
Follow the paint manufacturer's instructions for new plaster, including any recommended primer or first-coat preparation. Avoid universal internet recipes that ignore the specific paint product.
Separate the trades in your calendar: plaster first, drying second, decoration third. Leave enough flexibility for the actual wall conditions.