New plaster should be allowed to dry appropriately before decorating, but a fixed number of days is not reliable for every job. Product, thickness, background, temperature and ventilation all influence drying.
A skim and a deep repair are not the same
Thin finishing plaster and thicker areas of repair contain different amounts of moisture. One room can therefore dry unevenly even when everything was completed on the same day.
Room conditions matter
Cold conditions slow drying. British Gypsum specifies minimum background temperatures for its gypsum plaster products and notes that longer setting and drying times should be allowed in low temperatures.
Ventilation also needs to be sensible rather than treating the room like a sealed box.
Appearance is useful but not a universal test
Colour change can give an indication, but product instructions and actual conditions matter. If an area remains visibly different, feels suspect or was affected by a previous leak, do not paint simply because the calendar says enough days have passed.
Coordinate with the decorator
Tell the decorator what plastering and repairs were carried out. The first paint system should follow the paint manufacturer's guidance for new plaster rather than a one-size-fits-all recipe.
Plan with flexibility. The plaster is ready when the actual surface and product guidance say it is ready—not when a generic countdown ends.
Technical references
British Gypsum — minimum temperatures for gypsum products ↗British Gypsum — plastering technical FAQs ↗General planning guidance, not a diagnosis or a specification for your property. Follow project-specific professional advice and the relevant product instructions.