Keep the room within suitable temperature conditions and provide sensible ventilation, following the product and contractor guidance. Avoid extreme attempts to force-dry new plaster, and do not let the background freeze or stay below the product's stated minimum temperature.
Cold rooms slow the process
British Gypsum states minimum temperatures for gypsum plaster backgrounds and notes that low temperatures require allowance for longer setting and drying. That matters in unheated renovations during colder weather.
Ventilation helps moisture leave the room
Normal ventilation can help remove moisture released during drying. The aim is not a powerful draught across one wall while the rest of the room is cold; it is a stable environment where moisture can escape.
Do not improvise with intense direct heat
Placing strong heat directly against one area can create uneven conditions. Follow the plasterer's and product manufacturer's recommendations for the system used rather than trying to win a race against the decorating date.
Plan heating before the job in winter
If a property has no working heating, mention it at quote stage. Temporary arrangements may need considering before plastering, especially where the building is very cold.
Aim for steady temperature and sensible ventilation. Drying plaster is a controlled stage of the job, not something to force overnight.
Technical references
British Gypsum — minimum temperatures for gypsum products ↗General planning guidance, not a diagnosis or a specification for your property. Follow project-specific professional advice and the relevant product instructions.