Where electrical work requires new cables, boxes or chases, coordinate that first-fix work before the final plastering. Final fitting of accessories is then arranged around the finished and suitably dry surface by a competent electrician.
First fix can disturb the wall
New cable routes, back boxes and alterations may require cutting or chasing. Doing that after a completed skim usually creates avoidable damage and making good.
Agree who makes good around chases and boxes
Do not assume the electrician or plasterer has included every repair. The quote should identify where damaged surfaces are being filled, bonded or finished.
Keep electrical safety with the electrician
Do not remove sockets or alter wiring yourself simply to help the plasterer. Use a competent electrician for electrical work and coordinate isolation or accessory removal where required.
Final fit needs the right timing
Accessories, faceplates and final decoration should be sequenced so the new plaster can dry and the wall can be finished cleanly. Share dates between trades rather than booking each in isolation.
Coordinate electrical first fix before the final plaster finish, then arrange final electrical fitting afterwards. Make the boundary between trades explicit.
General buying and planning guidance. Examples are illustrative, not case studies or guaranteed outcomes. Your property and agreed scope determine the appropriate work.