The best way to avoid surprise costs is to make the scope explicit. Ask what preparation, materials, protection, waste arrangements and making good are included, and what would count as additional work.
Preparation before the skim
Removing loose material, repairing damaged areas, controlling suction or creating a suitable key may be needed before finishing plaster. Do not assume 'skim room' means every form of preparation is included.
Protection and moving items
Clarify whether the room needs to be empty, who moves large furniture and what protection is supplied for floors and access routes. If something cannot be moved, say so before the quote is finalised.
Other trades and fittings
Radiators, sockets, lighting, fitted units and plumbing can affect access. Plastering quotes do not automatically include electrical, plumbing, carpentry or decorating work. Confirm the hand-off between trades.
Waste, VAT and additional work
Check how waste from the agreed work is handled, whether VAT applies, and how extra work would be approved if hidden damage is discovered. A good quote does not need to predict every surprise, but it should make the process for surprises clear.
Ask what is included, what is excluded and what could legitimately change the price. That is how 'extras' stop being hidden.